Spadina Lift Station Bypass Building
Saskatoon SK
Construction of a new bypass lift station complete with :
-
Installation of a new 1200mm diameter pipe from the new wet well to diversion manhole.
-
Due to the spoil conditions a shoring system was installed.
-
All process mechanical, electrical and control systems were included.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Alloy Collision Center
Location: Saskatoon Sk
Client: Vaughn Wyant Investments Inc.
Acadia Drive Reservoir Pumping and Piping Upgrades
Saskatoon SK
-
Responsible for the engineering and installation of a new shoring system to allow for the construction of a new concrete valve chamber without disturbing the existing reservoir and pumping station
-
A new 900mm diameter casing sleeve was installed by directionally boring under the existing reservoir and connecting to the new sump pit in the reservoir.
-
Installation of a new 1200mm diameter header and 750mm diameter draw lines from the existing reservoir.
-
Installation of new sump within the reservoir.
-
Removal and replacement of valves and piping within existing pump station.
-
Soft Landscaping.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Alloy Collision Center
Location: Saskatoon Sk
Client: Vaughn Wyant Investments Inc.
City Of Saskatoon - Duct Banks
Saskatoon SK
-
Construction of concrete encased electrical ductbanks thru out the City of Saskatoon.
-
Installation of an engineered shoring system inside a straight walled excavation. Installation of all required pipe supports, spacers, PVC ducts, rebar and concrete.
-
Fillcrete backfill was placed to the underside of the new asphalt structure
-
Installation of precast manholes
![]() |
---|
![]() |
![]() |
![]() |
Alloy Collision Center
Location: Saskatoon Sk
Client: Vaughn Wyant Investments Inc.
SaskPower - Sewage Handling System Upgrades
Island Falls SK
-
Renovations of existing sewage handling system
-
Removal of 3 existing storage tanks, installation of 1 new one
-
New underground piping of 2 new sewage mounds
Alloy Collision Center
Location: Saskatoon Sk
Client: Vaughn Wyant Investments Inc.
Jackfish Lake Campground Infrastructure Construction
Jackfish Lake SK
-
Construction of 99 new campsites complete with new water and sewer connections.
-
Construction of a new water treatment plant/sanitary service building and a new washroom building.
-
Installation of owner supplied water treatment equipment and FRP storage tank.
-
Installation of a new lift station and connection to the existing well.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
Alloy Collision Center
Location: Saskatoon Sk
Client: Vaughn Wyant Investments Inc.
Muskoday First Nation Sewage Pumping Station Replacement
Muskoday First Nation SK
Construction of a new Sewage Pumping Station including :
-
Dry and Wet Well, Building Construction, Mechanical, Electrical and Underground Utilities.
-
The existing Pump Station was decommissioned and utilities were abandoned/capped.
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |