Road Building

Allan Construction does the complete roadway construction to the granular base level in accordance with the drawings and specifications. This involves earthworks, subgrade preparation, subbase gravel and base gravel.

 

Highway 27 & 41

• 14km construction of highway 
• Moved 660,000m3 through hills and sloughs
• SHCA - Grading Excellence of the Year

HighWay27-41_1
HighWay27-41_4
HighWay27-41_3
HighWay27-41_2
HighWay27-41_5
HighWay27-41_6

 

Highway 7 & 14 Interchange

  • 17,000m3 of topsoil stripping

  • 20,000m2 of subgrade construction

High 7 and 14 Air scape Pictures-June 20
High 7 and 14 Air scape Pictures-June 20
High 7 and 14 Air scape Pictures-June 20
High 7 and 14 Air scape Pictures-June 20

 

Kenaston Highway #15 - Grade Raise

• 1km of road building

• New culverts of riprap