Utilities

Allan Construction has the equipment and experienced operators to complete all excavation and backfilling requirements for new and existing utility installations.'

​

We have extensive experience constructing electrical duct banks throughout Saskatoon and at various mine sites across Saskatchewan. Our company-owned engineered shoring system allows us to complete this work safely and efficiently.

Spadina Lift Station Bypass Building 

Saskatoon SK

​ 

​ Construction of a new bypass lift station complete with:

​

  • Installation of a new 1200mm diameter pipe from the new wet well to diversion manhole.

  • Due to the spoil conditions a shoring system was installed.

  • All process mechanical, electrical and control systems were included.

Spadina - a
Spadina - 1
Spadina - 3
Spadina - 4
Spadina - 2
Spadina - 6
Spadina - 5
Spadina - 7
Spadina - 11
Spadina - 8
Spadina - 9
Spadina - 10

Acadia Drive Reservoir Pumping and Piping Upgrades ​

Saskatoon SK

​

  • Responsible for the engineering and installation of a new shoring system to allow for the construction of a new concrete valve chamber without disturbing the existing reservoir and pumping station

  •  A new 900mm diameter casing sleeve was installed by directionally boring under the existing reservoir and connecting to the new sump pit in the reservoir.

  • Installation of a new 1200mm diameter header and 750mm diameter draw lines from the existing reservoir.

  • Installation of new sump within the reservoir.

  • Removal and replacement of valves and piping within existing pump station.

  • Soft Landscaping.

acadia-2
acadia-1
acadia-5
acadia-3
acadia-7
acadia-4
acadia-6
acadia-8

Dream Development - Brighton Pond

Saskatoon SK

 

​​500,000m³ of area grading and pond construction

​

  • 644 lm of storm utilities, control chamber and manholes​

BrightonWater-2
BrightonWater-10
BrightonWater-1
BrightonWater-9
BrightonWater-8
BrightonWater-7
BrightonWater-6
BrightonWater-4
BrightonWater-3
BrightonWater-5

City Of Saskatoon - Duct Banks

Saskatoon SK​

​  ​

  • ​Construction of concrete encased electrical ductbanks thru out the City of Saskatoon.

  • Installation of an engineered shoring system inside a straight walled excavation. Installation of all required pipe supports, spacers, PVC ducts, rebar and concrete.

  • Fillcrete backfill was placed to the underside of the new asphalt structure

  • Installation of precast manholes

duct-banks - 1
duct-banks - 2
duct-banks - 3
duct-banks - 4

Chinook Power Station

Swift Current SK

​

  • ​10,000 lm of buried piping, high pressure air lines and electrical conduits

Util - Chinook 1
Util - Chinook 3
Util - Chinook 6
Util - Chinook 5
Util - Chinook 2
Util - Chinook 4
Util - Chinook 7

SaskPower - Sewage Handling System Upgrades

Island Falls SK

​

  • ​Renovations of existing sewage handling system

  • Removal of 3 existing storage tanks, installation of 1 new one

  • New underground piping of 2 new sewage mounds

Jackfish Lake Campground Infrastructure Construction

​Jackfish Lake  SK

​

  • Construction of 99 new campsites complete with new water and sewer connections.

  • Construction of a new water treatment plant/sanitary service building and a new washroom building.

  • Installation of owner supplied water treatment equipment and FRP storage tank.

  • Installation of a new lift station and connection to the existing well.

​

drone 002
drone 005
drone 007
drone 006
drone 001
drone 004

Muskoday First Nation Sewage Pumping Station Replacement

​Muskoday First Nation  SK

​​

​

Construction of a new Sewage Pumping Station including :

  • Dry and Wet Well, Building Construction, Mechanical, Electrical and Underground Utilities.

  • The existing Pump Station was decommissioned and utilities were abandoned/capped.

​