As a General Contractor, we will provide an Owner / Client with a tendered price to complete all work in accordance to the engineered drawings and specifications. We will also provide competent project managers and site superintendent to manage and complete the project

Sid Buckwold Bridge Rehabilitation 

Saskatoon SK

Two year restoration project on the Sid Buckwold Bridge including work on Idylwyld Drive and 1st Avenue North Flyovers

  • New concrete barriers, deck replacement on the bridge

  • Concrete repairs to deck, soffit, and abutments

  • New membrane and asphalt 

  • One new overhead sign structure 

  • Bridge jacking for abutment repairs 

  • Pigeon removal and bird exclusions 

  • Installation of 16 new expansion joints.

SBS - 2
SBS - 8
SBS - 4
SBS - 7
SBS - 6
SBS - 5
SBS - 3
SBS - 11
SBS -1
SBS - 10
SBS - 9

Avenue P Medical Office Building

Saskatoon SK

  • Construction of a four storey concrete building and underground parkade. Completed the tenant improvements on 3 of 4 floors.

  • Due to an extremely congested work area we were unable to use a tower crane for the construction

  • The EFCO forming system was used for all the concrete.

Mob1
Mob13
Mob3b
Mob2
Mob6
Mob4
Mob7
Mob5
Mob9
Mob8
Mob10
Mob12
Mob11

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Spadina Lift Station Bypass Building

​Saskatoon SK

Construction of a new bypass lift station complete with :

  • Installation of a new 1200mm diameter pipe from the new wet well to diversion manhole.

  • Due to the spoil conditions a shoring system was installed.

  • All process mechanical, electrical and control systems were included.

Spadina - a
Spadina - 1
Spadina - 3
Spadina - 4
Spadina - 2
Spadina - 6
Spadina - 5
Spadina - 7
Spadina - 11
Spadina - 8
Spadina - 9
Spadina - 10

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Pilot Butte Wastewater Treatment System Upgrade

Pilot Butte SK

  • Construction of a new sewage pumping station including a 65m   building over a  5.8m deep wet/dry chamber. Supply and installation of new pumping, mechanical, electrical and control equipment.

  • Construction of a new 100m  aeration building including 4 new blower units, electrical, mechanical and control equipment.

  • 1.5KM of 250 - 400mm HDPE force main

  • 1.7KM of 250 - 400mm PVC influent/effluent pipe

  • 2.55ha HDPE lined lagoon aeration cell including all new air distribution piping

  • 162,500m3 compacted clay lined lagoon storage cell

  • Two new 32m x 90m submerged attached growth reactor cells (SAGR) including all wastewater and air distribution piping.

  • Construction of new roads, ditches and site grading

Pilot Butte - 11
Pilot Butte - 1
Pilot Butte - 3
Pilot Butte - 2
Pilot Butte - 4
Pilot Butte - 5
Pilot Butte - 6
Pilot Butte - 7
Pilot Butte - 9
Pilot Butte - 8
Pilot Butte - 10

2

2

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Charlot River and White Lake Spillway Upgrades

Athabasca Region SK

This project included work to two separate spillways at the Saskpower Hydrostation in the Athabasca Region.

Charlot River Structure:

  • Engineered temporary shoring system. Work completed in 4 phases due to the Owner’s requirement for the structureto remain operational.

  • All work was completed from the downstream side of the structure. 

  • New concrete foundations, walls, support pedestals

  • Misc concrete repairs including new rock anchors

  • Installation of new structural steel gates, decking, grating and handrails. Blasting and painting existing structural steel

  • Installation of Owner supplied de-icing system

White Lake Structure:

  • Temporary diversion structure installed at the weir to allow for construction access on the down stream side of the spillway

  • Engineered temporary shoring system. Work completed in 2 phases due to the Owner’s requirement for the structure to remain operational.

  • New concrete foundations, walls, support pedestals

  • Misc concrete repairs including new rock  anchors

  • Installation of new structural steel gates, decking, rating and handrails. Blasting and painting existing structural steel.

  • Installation of Owner supplied de-icing system

This project was located in Northern Saskatchewan with access only by air or barge.

x - 20201009_145631459_iOS
x-20200717_215518516_iOS
x-20201008_174051602_iOS
20200711_210001853_iOS
20200904_210306515_iOS
20200715_021235191_iOS
x - 20200715_235213121_iOS
x - 20201008_174311516_iOS

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Slope and Shoreline Erosion Protection Measures

Lumsden SK

Slope and shoreline erosion protection at 2 locations on Highway 20.
Project included:

  •  clearing & grubbing 

  • excavation of embankment slopes

  • installation of new sheet piling at both locations

  • installation of an engineered concrete block tie back system at one location

  • granular sand backfill

  • installation of concrete reinforced mats at both locations complete with topsoil and seed infill

  • new guardrail system

 

All traffic accommodation was completed by Allan Construction

x-20201022_134108
y-20201030_203317069_iOS
y -20201016_163747011_iOS
x-20201122_152102
x-20201121_160404
y-20201201_224700533_iOS
y-20201125_182608713_iOS
re - 10ws - y-20201201_223347125_iOS
x-20201127_103606
x-20201126_084129
x-20201123_163927
re - 9ws - y-20201201_223032545_iOS
re - 11ws - y-20201201_224619610_iOS
x-20201014_074152

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Island Falls Concrete Rehabilitation  ​- Phase 2, 4, 6 & 8

Island Falls SK

​​​​​Work at 'A' Dam:

  •  Dredging at west abutment

  •  Installation of sheet piles and reinforced concrete infill

  •  Extension of east pier

  • Concrete Beam Reinforcing

  • Stoplog Lifter Approach Slab Extension and Rails

  • Curb Extension & Guardrail Improvements

  • Lighting and Electrical Distribution Upgrades

Work at 'Main' Dam:

  •  Removal of existing conduit, handrail, concrete curb, steel scrap and timber stoplogs

  •  Corbel construction on underside of existing deck

  •  16" concrete topping to entire deck

  •  New crane rails

  •  Lift and roll gantry crane and stop log lifter onto new concrete deck

  •  Conduit, lighting, electrical distribution, grating, handrail and fencing

  •  Misc. Repairs to upstream deck face

  • Concrete restoration on main dam piers and new concrete coatings

  • Reinforcing the rail beams

  • New concrete slab for the stoplog lifter

  • Trestle Bridge Upgrades

  • Cladding Replacement

  • Underwater Concrete Repairs

I-Falls1
islandfalls-10
I-Falls8
I-Falls3
I-Falls7
I-Falls4
I-Falls9

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

St. Thomas More College - Cafeteria and Library Addition

​Saskatoon SK

  • Expansion of St. Thomas More’s cafeteria and library along with additional student centered space including a new lounge and student services hub. 

  • A new 5 storey elevator was installed to provide total access throughout the college and an existing elevator was removed and filled in for office use.

  • Recipient of the 2018 Municipal Heritage Awards Program: Award of Merit “Sensitive Addition”
     

STM North
IMGP0413

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Sask Landing Bridge Rehabilitation

​Sask Landing SK

  • Pictures showing the construction progress for the Sask Landing Bridge Rehabilitation.

Sask Landing Bridge (6)
Sask Landing Bridge (9)
Sask Landing Bridge (8)
Sask Landing Bridge (7)
Sask Landing Bridge (5)
Sask Landing Bridge (4)
Sask Landing Bridge (1)
Sask Landing Bridge (2)
Sask Landing Bridge (14)
Sask Landing Bridge (3)
Sask Landing Bridge (10)
Sask Landing Bridge (13)
Sask Landing Bridge (12)
Sask Landing Bridge (11)

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Waterloo Spillway Rehabilitation

​Athabasca Region SK

  • Installation of temporary shoring system for the removal of the old structural column braces and installation of the new structural columns and bracing system.

  • New reinforced concrete sill extension c/w rock anchors and dowels.

  • Extension of the walkway and modifications to the handrail system.

  • Installation of new owner supplied spillway gates and de-icing system. Removal of the existing wood spillway gates.

  • Access to the project site was by air or barge.

Waterloo - 1
Waterloo - 4
Waterloo - 2
Waterloo - 3
Waterloo - 5
Waterloo - 9
Waterloo - 6
Waterloo - 7
Waterloo - 11

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Waskesiu Marina Dock & Infrastructure Replacement

​Waskesiu SK

  • Remove existing docks and wood timber piles prior to the ice forming.

  • Engineer and build the ice in the harbor to the engineered thickness.

  • Supply and install the new pipe piles through the ice. 

  • New docks were installed on top of the ice and set in place during the spring thaw.

  • Misc. lighting revisions

Waskesiu - Complete 3
Waskesiu1 - Cut1
Waskesiu2 - Flood
Waskesiu3 - Piles2
Waskesiu4 - Piles1
Waskesiu7 - Complete2
Waskesiu5 - Complete1
Waskesiu6 - Complete4

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Landfill Gas Collection System

​Saskatoon SK

Supply and installation of:

  •  850 lm of 300mm diameter header pipe and 250mm diameter utilization pipe around the City of Saskatoon the landfill.

  • 100mm and 200mm diameter lateral pipe from the main header line to the 29 wells installed thru out the landfill.

  • A 225m2 pre-engineered Blower Flare Station complete with all process mechanical and electrical, condensate
    chamber, and installation of Owner supplied dryer/chiller system and Flare.

  • A new 315 m  pre engineered power generation facility adjacent to the landfill
    complete with the installation of 2 - 800 kWe.

  • Owner supplied engine generator sets and all process mechanical and electrical.

land fill 4 copy
Landfill - 2
Landfill - 5
Landfill - 4
landfill
Landfill - 3
Landfill - 7
land fill 2
Landfill - 6

2

Alloy Collision Center

Saskatoon SK

  • Construction of a new 57,500sq ft main floor and 8,500sq ft 2 floor collision center in Saskatoon.

  • Timber piles with structural steel, masonry, structural steel studs, cladding and curtain wall exterior.

  • Slab on grade and structural slabs throughout the building.

  • All underground utilities and new asphalt parking lot for the Alloy Collision Center and Spiffy Car Wash.

Alloy1
Alloy2
Alloy6
Alloy4
Alloy3
Alloy5
Alloy7
Alloy10
Alloy8
Alloy9
Alloy11
Alloy12
Alloy16
Alloy15
Alloy14
Alloy13
bottom of page