General Contracting

As a General Contractor, we will provide an Owner / Client with a tendered price to complete all work in accordance to the engineered drawings and specifications. We will also provide competent project managers and site superintendent to manage and complete the project

Alloy Collision Center

Saskatoon SK

  • Construction of a new 57,500sq ft main floor and 8,500sq ft 2 floor collision center in Saskatoon.

  • Timber piles with structural steel, masonry, structural steel studs, cladding and curtain wall exterior.

  • Slab on grade and structural slabs throughout the building.

  • All underground utilities and new asphalt parking lot for the Alloy Collision Center and Spiffy Car Wash.

Alloy1
Alloy2
Alloy6
Alloy4
Alloy3
Alloy5
Alloy7
Alloy10
Alloy8
Alloy9
Alloy11
Alloy12
Alloy16
Alloy15
Alloy14
Alloy13

Avenue P Medical Office Building

Saskatoon SK

  • Construction of a four storey concrete building and underground parkade. Completed the tenant improvements on 3 of 4 floors.

  • Due to an extremely congested work area we were unable to use a tower crane for the construction

  • The EFCO forming system was used for all the concrete.

Mob1
Mob13
Mob3b
Mob2
Mob6
Mob4
Mob7
Mob5
Mob9
Mob8
Mob10
Mob12
Mob11

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Spadina Lift Station Bypass Building

​Saskatoon SK

Construction of a new bypass lift station complete with :

  • Installation of a new 1200mm diameter pipe from the new wet well to diversion manhole.

  • Due to the spoil conditions a shoring system was installed.

  • All process mechanical, electrical and control systems were included.

Spadina - a
Spadina - 1
Spadina - 3
Spadina - 4
Spadina - 2
Spadina - 6
Spadina - 5
Spadina - 7
Spadina - 11
Spadina - 8
Spadina - 9
Spadina - 10

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Island Falls Concrete Rehabilitation  ​- Phase 2, 4, 6 & 8

Island Falls SK

​​​​​Work at 'A' Dam:

  •  Dredging at west abutment

  •  Installation of sheet piles and reinforced concrete infill

  •  Extension of east pier

  • Concrete Beam Reinforcing

  • Stoplog Lifter Approach Slab Extension and Rails

  • Curb Extension & Guardrail Improvements

  • Lighting and Electrical Distribution Upgrades

Work at 'Main' Dam:

  •  Removal of existing conduit, handrail, concrete curb, steel scrap and timber stoplogs

  •  Corbel construction on underside of existing deck

  •  16" concrete topping to entire deck

  •  New crane rails

  •  Lift and roll gantry crane and stop log lifter onto new concrete deck

  •  Conduit, lighting, electrical distribution, grating, handrail and fencing

  •  Misc. Repairs to upstream deck face

  • Concrete restoration on main dam piers and new concrete coatings

  • Reinforcing the rail beams

  • New concrete slab for the stoplog lifter

  • Trestle Bridge Upgrades

  • Cladding Replacement

  • Underwater Concrete Repairs

I-Falls1
islandfalls-10
I-Falls8
I-Falls3
I-Falls7
I-Falls4
I-Falls9

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

St. Thomas More College - Cafeteria and Library Addition

​Saskatoon SK

  • Expansion of St. Thomas More’s cafeteria and library along with additional student centered space including a new lounge and student services hub. 

  • A new 5 storey elevator was installed to provide total access throughout the college and an existing elevator was removed and filled in for office use.

  • Recipient of the 2018 Municipal Heritage Awards Program: Award of Merit “Sensitive Addition”
     

STM North
IMGP0413

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Sask Landing Bridge Rehabilitation

​Sask Landing SK

  • Pictures showing the construction progress for the Sask Landing Bridge Rehabilitation.

Sask Landing Bridge (6)
Sask Landing Bridge (9)
Sask Landing Bridge (8)
Sask Landing Bridge (7)
Sask Landing Bridge (5)
Sask Landing Bridge (4)
Sask Landing Bridge (1)
Sask Landing Bridge (2)
Sask Landing Bridge (14)
Sask Landing Bridge (3)
Sask Landing Bridge (10)
Sask Landing Bridge (13)
Sask Landing Bridge (12)
Sask Landing Bridge (11)

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Waterloo Spillway Rehabilitation

​Athabasca Region SK

  • Installation of temporary shoring system for the removal of the old structural column braces and installation of the new structural columns and bracing system.

  • New reinforced concrete sill extension c/w rock anchors and dowels.

  • Extension of the walkway and modifications to the handrail system.

  • Installation of new owner supplied spillway gates and de-icing system. Removal of the existing wood spillway gates.

  • Access to the project site was by air or barge.

Waterloo - 1
Waterloo - 4
Waterloo - 2
Waterloo - 3
Waterloo - 5
Waterloo - 9
Waterloo - 6
Waterloo - 7
Waterloo - 11

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Waskesiu Marina Dock & Infrastructure Replacement

​Waskesiu SK

  • Remove existing docks and wood timber piles prior to the ice forming.

  • Engineer and build the ice in the harbor to the engineered thickness.

  • Supply and install the new pipe piles through the ice. 

  • New docks were installed on top of the ice and set in place during the spring thaw.

  • Misc. lighting revisions

Waskesiu - Complete 3
Waskesiu1 - Cut1
Waskesiu2 - Flood
Waskesiu3 - Piles2
Waskesiu4 - Piles1
Waskesiu7 - Complete2
Waskesiu5 - Complete1
Waskesiu6 - Complete4

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Landfill Gas Collection System

​Saskatoon SK

Supply and installation of:

  •  850 lm of 300mm diameter header pipe and 250mm diameter utilization pipe around the City of Saskatoon the landfill.

  • 100mm and 200mm diameter lateral pipe from the main header line to the 29 wells installed thru out the landfill.

  • A 225m2 pre-engineered Blower Flare Station complete with all process mechanical and electrical, condensate
    chamber, and installation of Owner supplied dryer/chiller system and Flare.

  • A new 315 m2  pre engineered power generation facility adjacent to the landfill
    complete with the installation of 2 - 800 kWe.

  • Owner supplied engine generator sets and all process mechanical and electrical.

land fill 4 copy
Landfill - 2
Landfill - 5
Landfill - 4
landfill
Landfill - 3
Landfill - 7
land fill 2
Landfill - 6

317 103 St E, Saskatoon, SK S7N 1Y9, Canada          

p: (306) 477-5520                        

e: info@allanconstruction.ca

2018 Allan Construction 

  • Instagram Social Icon
  • Facebook Social Icon
  • Twitter Social Icon
  • YouTube Social  Icon
Landfill - 6